Customization: | Available |
---|---|
Certification: | CE, TUV, ISO, SGS |
Warranty: | 2 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | YWER | ||||
Internal Dim.W×H×D(mm) | Please refer to size chart | ||||
External Dim.W×H×D(mm) | |||||
Temp. Range | 0°C;-20°C;-40°C;-60°C~+70°C(+80°C) | ||||
Relatice Humidity Range | 30~95%RH±0.3°C; | ||||
Performance | Temp.&Humi.fluctuation | ±0.3°C;±0.5%RH | |||
Temp.&Humi.Uniformity | ±3°C;±5%RH | ||||
Indication Resolution | 0.01°C; 0.1%RH | ||||
Heat-up Time | °C | 80 | |||
min | 50 | ||||
Pull-down Time | °C | 0 | -20 | -40 | |
min | 55 | 70 | 100 | ||
Material | Exterior | SUS#304 Stainless steel/PVC+Powder Coated | |||
Interior | SUS#304 stainless steel piate | ||||
Insulation | Ployurethane foam 100mm (75mm) (50mm) | ||||
Systems | Circulation | Siroco fan | |||
Heating | SUS#304 stainless steel high-speed heater | ||||
Humidifying | Surface evaporating system | ||||
Cooling | Airtight compressor+vaporator fins+air-cooling (or water-cooling)condenser |
||||
Dehumidifying | ADP Critical dewpoint cooling/dehumidifying method | ||||
Controller | Digital electronic indicators+S.S.R.With PID | ||||
Other Components | Airtight compressor+evaporator fins+air-cooling (or water-cooling)condenser |
||||
Safety Devices | Overheating prevention ciruit-breaker, compressor overload protection,control system overload, humidifying system, overheating & drying out prevention, breakdown indicator light. |
||||
Power Source(K.W) | AC 1Ψ 220V 50Hz; 3Ψ 380V 60/50Hz |
• We have independent workshops, they are consist of material bending and welding area, machine assemble area, electric system area, cooling system area ,testing and finished product area.
• We produce in strict accordance with international safety standard.
• Many stock spare parts in warehouse ensure customer can get soon when they need.
7. QC Profile:
• We use imported accessories, performance is more stable.
• All products will be continously tested for 4-7 days before delivery to check the equipment's running.
• We have set up quality supervision department, they will supervise every production process to ensure excellent product performance and outlook before delivery. We have set up quality supervision department, they will supervise every production process to ensure excellent product performance and outlook before delivery.