Customization: | Available |
---|---|
Max Diameter of Workpiece: | 500mm |
Mass Scope of Workpiece: | <900kg |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Russian Controller 800L Temperature Moisture Climate Chamber
Application:
Three Layers Constant Temperature and Humidity Test Cabinet, used for material performance test under different environment, such as heat, cold, moisture, heat and moisture, mainly applied in electronics, electrical appliances, mobile, communications, instruments, vehicles, plastic products, metals, food, chemicals, building materials, medical, aerospace and other industries.
Features:
1.Touch screen controller.
2.Automatic water filling(optional).
3.Access to PC remote control and monitoring.
4.Customization services.
5.With national patents.
High low temperature tester Specification:
Temperture Humildity Chamber | ||||||
Model | YTH-080 | YTH-150 | YTH-225 | YTH-408 | YTH800 | YTH1000 |
Inner chamber size W×H×D(cm) | 40×50×40 | 50×60×50 | 60×75×50 | 80×85×60 | 100×100×80 | 100×100×100 |
Exterior chamber size W×H×D(cm) | 60×172×120 | 70×174×130 | 70×172×181 | 100×182×197 | 120×197×197 | 120×197×217 |
Testing temperature range | -70ºC,-60ºC,-40ºC,-20ºC,0ºC~150ºC,Other temperture can be customized | |||||
Testing humidity range | 20%RH~98%RH(low humidity10%RH~98RH or 5%RH~98%RH can be customized | |||||
Temp.humi.fluctuation | ±0.3ºC;±0.5%RH | |||||
Temp.humi.uniformity | ±2ºC;±3%RH (empty loading after stablize for 30mins) | |||||
Temp.humi.resolution | 0.01ºC;0.1%RH | |||||
Heating&cooling time ºC/min | Heat-up:3ºC/min(average),cool-down:1ºC/min(average) | |||||
Exterior chamber material | Cold rolled plate + Powder coating | |||||
Inner chamber material | SUS#304 Stainless steel | |||||
Insulation material | PU | |||||
Circulation system | Centrifugal fan air circulation system | |||||
Heating system | SUS# Stainless steel high-speed heater | |||||
Humidification system | Electrothermal steam humidification | |||||
Dehumidifying | ADP critical dew point cooling/ dehumidifying method | |||||
Refrigeration system | Compressor + Finned evaporator + Air(Water) cooling condenser | |||||
Controlling system | Touch screen controller | |||||
Other components | Vacuum glass observation window | |||||
Test hole (50mm) | ||||||
Control status indicator | ||||||
View light | ||||||
Compartment shelf (2 freely adjustable) | ||||||
Safety protection device | Overheat protection circuit breaker | |||||
Humidification system overheat protection | ||||||
Compressor overload protection | ||||||
Control system overload protection | ||||||
overload indicator | ||||||
Phase sequence protection | ||||||
Water shortage protection | ||||||
High voltage and low voltage protection | ||||||
Over temperature protection | ||||||
Water supply dely protection | ||||||
Fan overcurrent protection | ||||||
Power supply | AC 1ψ 220V; 3ψ380V 60/50Hz | |||||
Customization service | No-standard or special requirements are all welcome |
3. Many stock spare parts in warehouse ensure customer can get soon when they need.2. We produce in strict accordance with international safety standard.More detail of temperature humidity tester
Industrial test equipment Production Line:
1. We have independent workshops, they are consist of material bending and welding area, machine assemble area, electric system area, cooling system area ,testing and finished product area.
Yuanyao profile
If you want to know more about the temperature humidity test chamber,
please feel free to conatct me.
Welcome to inquiry !